|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Valence Sewage Treatment Tank SystemsValence manufacture very high quality package domestic and commercial sewage treatment systems from 1 to 250 persons.Unfortunately, they do not yet have the EN 12566-3 Certification, but can be used over 50 persons as the EN does not then apply. They are all 3 stage sewage treatment tanks with primary settlement tanks and require concrete for the installation. All are suitable for direct discharge to a watercourse. The Valence SAMI sewage treatment systemChecklist
The unit shown opposite is the Valence SAMI 5 person sewage treatment tank system suitable for a 3 bedroom house. This units are 3 stage tanks. Sewage enters the Primary Settlement Tank where gross solids are retained for periodic de-sludging. The settled sewage liquor is transferred by gravity to the Biozone where the wastewater is aerated via a small compressor housed under the lid. Aerobic bacteria digest the organic matter and the clean effluent is displaced into the final settlement tank for settlement of dead bacteria, etc. prior to discharge. There is no kiosk and the sewage system is rated at only 47 watts. The sewage treatment tanks are designed to BS6297
The Valence Sami can also discharge to a ditch or watercourse
Valence VES 1 to 4 sewage treatment tank systems Checklist
![]() 5 units in the treatment range (7 to 28 persons)
These sewage treatment tanks are 7, 10, 14, 20 and 28 persons.
Wastewater enters the primary settlement tank and then the liquor baffles throught to the biozone where it is pumped up to a distribution weir. It is then sprayed over the media and trickles through back to the sump of liquor to repeat the process. The cleaned effluent then passes into the final settlement chamber where it enters the drain. The system is very quiet as the pump is so far underground. There is no smell from these sewage treatment tanks as the primary settlement tank is underneath the aerobic biozone. The pump is easy to access.
Technical Details of the Valence sewage treatment system
Valence VES 5 to 16 sewage treatment system (29 to 250 persons) Checklist
The Valence range of sewage treatment plants are very reliable and the choice of many Holiday Park companiesThese commercial sewage treatment tanks are very inexpensive when compared to other large sewage treatment plants. Like Klargester and Titan, they are 3 stage tanks, but the primary settlement tank is also a 2 stage to ensure sufficient settlement time for gross and medium fine solids. The submerged aerated media pack is aerated via a rotary vane compressor housed in a kiosk near the unit. Aerobic bacteria grow on the media and digest the organic matter in the Technical Specifications
See PRODUCTS for other sewage treatment systems. |
Latest News
Installers Wanted
Act on CO2
Septic Tank Failure
Caravan Parks
Wastewater Tutorial
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||